The Engineering Team is a team of professional staff that is dedicated to the assessment, design, construction and implementation of system upgrades as well as new development of the City of Lloydminster’s water, sanitary sewer, storm sewer, transportation and drainage channel infrastructure. Our team of dedicated personnel work closely with other City of Lloydminster departments to review, assess and implement capital infrastructure programs to improve our systems capacity, resilience, safety, resident mobility, as well as forecast for future expansion and development within and adjacent to the City of Lloydminster. The programs completed by the Engineering Team range from traffic flow assessments and municipal infrastructure upgrades, to storm channel improvements.
The Engineering Team maintains and regularly updates the City of Lloydminster Master Plans and Documents. The Master Plans form the baseline from which system upgrades and improvements are derived as well as provides a road map for future development and expansion of the City of Lloydminster to ensure all neighbourhoods within the City of Lloydminster receive the same level of service regardless of location.
View the 2024 Engineering Capital Infrastructure Projects
Master Technical Specifications |
|
Municipal Development Standards |
North and South Corridor Project |
The North-South Corridor Project consists of converting 50 Avenue to a one-way southbound and 49 Avenue to a one-way northbound transitioning at 42 Street and 57 Street, respectively. Underground work and extensive surface road work must be completed to finish the multi-year North-South Corridor Project. Phase 1A was accepted as a Capital Budgeted Project in 2014 and included the following:
Phase 1B was approved, subjected to Capital Budget financing in 2016, includes:
The following are two videos featuring three-dimensional artist renderings of the proposed concept for the North-South Corridor Project. Please note, all aspects of the renderings are subject to change. The videos are intended to provide a general overview of the potential southbound and northbound one-ways featured in the proposed corridor. |
Pre-Qualified Contractors |
|
Project Update Report |
|
Water & Sewer Replacement Program |
The Water & Sewer Replacement Program is an annual program intended to replace and upgrade underground municipal infrastructure throughout the community to ensure serviceability and longevity of the city's underground systems are maintained. |
Street Improvement Projects |
Each year, the City implements a street improvement project. These projects are designed to help ensure the safety and accessibility of our roadways. |
Traffic Counting Reports |
The Engineering team uses Traffic Count Reports to assess the current roadway status and common resident driving trends. |